1·Eleventh sliver project construction supervision system.
第十一条子项目建设实行监理制度。
2·The project construction period is expected to 8 months.
该项目建设期预计为8个月。
3·During the project construction , quality is in the first place.
在工程建设过程中,质量是处在第一位的。
4·Abstract: : the project construction quality control is multifaceted.
摘要:项目建设的质量控制是多方面的。
5·The contract management is the core of project construction management.
合同管理是工程建设项目管理的核心。
6·The quality of garden landscaping is the core of the project construction.
园林绿化工程建设质量是项目建设的核心。
7·Activity-Based Costing; Engineering Project Construction; Cost Management.
作业成本法;工程项目施工;成本核算;成本管理。
8·The technology have generally significance to the similar project construction.
该技术对类似工程施工有普遍指导意义。
9·Obviously, basic telecommunication network project construction are no exception.
显然,基础通信网络工程建设也不能例外。
10·Establishes the construction drawing budget, definite project construction cost basis.
是编制施工图预算,确定工程造价的依据。